Verizon Shell Building & Site Improvements

General Construction and Project Management of a new commercial retail facility. Consisted of all site grading and underground improvements occurring during wet weather and forcing SWPPP implementation. Met compaction regardless of less than ideal soil and weather conditions. Project exceeded scheduled time frames primarily due to weather but also poor engineering. GBI as a local contractor was instrumental by involving … Read More

Hobby Lobby Landlord Improvements

Had previously demo’d and prepped space for Hobby Lobby and their TI contractor who ran into trouble prior to final inspection with their newly completed concrete entry not meeting ADA compliance. We were contacted and asked to help, reacting quickly with one of our local subcontractors who worked throughout the night removing and replacing the sloped concrete entry to comply … Read More

Quest Diagnostics

GBI performed the Tenant Improvements for 2-Quest Diagnostic Medical Labs, one in Oroville and another in Anderson, Calif. These involved preparing the tenant space for construction, making utility improvements as needed, providing the corrected under floor plumbing, electrical and mechanical upgrades, new framing, drywall, ceilings, and floor coverings, and all the improvements as shown on plans and specifications for a … Read More

Light Soda on Tap

Industrial tenant improvement project in San Francisco involving both interior and exterior improvements, required much assistance with design and permitting. Restaurant equipment business that remained operational while new warehouse and offices were modified to adapt to new business. Full utility upgrades, primarily for electrical and fire systems, full office remodel with all new walls and finished surfaces, major ADA modifications … Read More

Party City

Negotiated Contract, included design, engineering, and permit approvals. Design involved solution for “structural, fire stop, demising wall” that was intended to be removed to accommodate the space requirements. Fire sprinklers had to be brought into the entire building and shear with improved anchorage added to structural wall to maintain structural and fire integrity. Project had stopped more than once as … Read More

Rexel

2014 – Completion Date Commercial Tenant improvement. Negotiated Contract, included design and permit approvals. Modified and upgraded existing office area and bathrooms, new finishes, upgraded interior and exterior for ADA compliance.

Family Chiropractic

Chiropractic Office. Provided design consultation and advice for owners design team. Involved stained and sealed concrete floor finishes, shielded wall x-ray station, and furniture quality paint finishes to identify the owner’s signature look.

Complete Nutrition

Retail Tenant Improvement. Negotiated Contract. Required using owner provided fixtures and equipment, much of it used and in need of refurbishing or modification to match owner layout and quality standards. Complete interior build out.

443 Redcliff

GSA Tenant Improvement: Negotiated Contract with building owners. Provided Construction Management from concept through completion. Managed and supervised accelerated schedule for complete interior and exterior remodel. Gutted interior to rough shell, rebuilt all interior to clerical and administrative offices per GSA requirements and specifications. Rehabilitated landscaping and building exterior, reconfigured parking areas to include secure parking and ADA compliance.

Institute of Technology

School: Negotiated Contract. 45,000 Sq Ft Tenant Improvement, Design/Build Project from contact to completion. Included demo of previous retail, modifications to entrance, shell, and parking areas, ADA and Path of Travel improvements, fast tract construction of full interior build out with completion occurring seven weeks after work starting.