Verizon Shell Building & Site Improvements

General Construction and Project Management of a new commercial retail facility. Consisted of all site grading and underground improvements occurring during wet weather and forcing SWPPP implementation. Met compaction regardless of less than ideal soil and weather conditions. Project exceeded scheduled time frames primarily due to weather but also poor engineering. GBI as a local contractor was instrumental by involving … Read More

Hobby Lobby Landlord Improvements

Had previously demo’d and prepped space for Hobby Lobby and their TI contractor who ran into trouble prior to final inspection with their newly completed concrete entry not meeting ADA compliance. We were contacted and asked to help, reacting quickly with one of our local subcontractors who worked throughout the night removing and replacing the sloped concrete entry to comply … Read More

Quest Diagnostics

GBI performed the Tenant Improvements for 2-Quest Diagnostic Medical Labs, one in Oroville and another in Anderson, Calif. These involved preparing the tenant space for construction, making utility improvements as needed, providing the corrected under floor plumbing, electrical and mechanical upgrades, new framing, drywall, ceilings, and floor coverings, and all the improvements as shown on plans and specifications for a … Read More

Light Soda on Tap

Industrial tenant improvement project in San Francisco involving both interior and exterior improvements, required much assistance with design and permitting. Restaurant equipment business that remained operational while new warehouse and offices were modified to adapt to new business. Full utility upgrades, primarily for electrical and fire systems, full office remodel with all new walls and finished surfaces, major ADA modifications … Read More

The Abbey at New Clairvaux

Commercial wood framing project in Vina, Calif. Project is an extension of a very old stone abbey reassembled from its original location in Spain. The monks at New Clairvaux discovered their original chapel had been salvaged after WWII and shipped to San Francisco with the intention of having it rebuilt there. It sat in storage forgotten until discovered by the … Read More

Lavender Hills Assisted Living

Commercial wood framing project in Redding, Calif. Consisted of building a 12,000 sq ft Extended Care Facility. In this case the concrete subcontractor attempted pouring larger areas than capable resulting in a less than perfect slab surface. GBI went the extra mile by shimming and straight lining to correct at the roof peak and facia of the overall building. Result … Read More

College of the Redwoods

Commercial wood framing project in Crescent City, Calif. Consisted of building a new Science Laboratory and involved a full time State inspector who observed all aspects of construction while it was occurring. As a school and a public facility, this project was required to meet all applicable design criteria “above and beyond the standard of the industry”. GBI easily met … Read More